
New gasket after prepping with acetone.
	
Needed to modify the power-steering pump bracket to fit above the new header.
	
	
TRUST Header installed.
Ordered the TRUST header 5/6MGE 10510550 and combiner 11010001 from FortyOne Automotive in NZ. Took a while to manufacture and eventually arrive.
But this is what it looks like.
	
	
Unfortunately it got a bit scuffed during shipping. So i gave it a touch up coat of VHT flameproof blue.
	
List of remaining things required before the car can be registered:
Necessary
- Reinstall cat converter. ☑
 - Rebuild the dash. ☑
 - Check brake lines and bleed. ☐
 - Fix petrol tank lid. ☑
 - Fix and install grille. ☐
 - Attach front bumper. ☐
 - Install front bumber indicators. ☐
 - Get Front and Rear windscreens supplied and installed - need to find a reliable glazier who can supply and install NAGS code TT1506 PGI code TT9000. Size 1510 x 723. ☐
 - Fix relay or fuse for parking headlights. ☑
 - Install bonnet. ☐
 - Retorque head bolts to 74 Ft/lb. ☑
 - Install washer bottles. ☐
 - Acquire and install boot rubber. ☑
 - Complete filling the car with fluids. ☑
 - Finish rebuilding interior trim. ☐
 - Source new tyres. ☑
 - Start car. ☐
 
Optional
- Acquire and fit a new stereo. ☐
 - Rebuild passenger side door. ☑
 - Install mud guards and under body plastic protection. ☐
 - Fog lights. ☐
 
	
	

Wired in the fusebox and ignitor today.
	
	
Finished the removal of the wiring loom this evening. There must be about 10Kg of wiring loom in total. I wonder if there is some way to simplify this?
	
	




























